IMG_5064
Nailing down the salvaged floor boards in the reception center.
Date: 01/18/2012
Views: 6304
|
IMG_5067 cr
Hopewell Depot on a snowy day in January 2012.
Date: 01/21/2012
Views: 5551
|
IMG_5068
Salvaged boards are not all the same size.
Date: 01/25/2012
Views: 6191
|
IMG_4869
Our construction boss, Rich Taylor is honored by the Eleanor Roosevelt group at Val-Kill.
Date: 12/11/2011
Views: 8632
|
IMG_4876
Christmas decorations on the south wall.
Date: 12/14/2011
Views: 4510
|
IMG_4976
Christmas at the depot.
Date: 12/21/2011
Views: 8762
|
IMG_4999
Restored bead board on the reception room wall.
Date: 12/28/2011
Views: 4387
|
IMG_5002
Leveling the reception Center floor joists.
Date: 01/04/2012
Views: 5227
|
IMG_3857
Coffee break on a rainy day.
Date: 04/16/2011
Views: 5448
|