IMG_4842
New ceiling in the ticket office.
Date: 12/07/2011
Views: 38710
|
IMG_4843
A welcome addition to the depot facilities.
Date: 12/10/2011
Views: 13829
|
IMG_4847
Jacking up a sag in the reception center floor.
Date: 12/10/2011
Views: 15123
|
IMG_4849
A hatch in the ceiling for access to the attic insulation work.
Date: 12/10/2011
Views: 16620
|
IMG_4850
New battens for the east wall.
Date: 12/10/2011
Views: 15157
|
IMG_4856
Feeding insulation bales into the blower hopper.
Date: 12/11/2011
Views: 18427
|
IMG_4857
This was the hose to blow insulation into the ceilings.
Date: 12/11/2011
Views: 17526
|
IMG_4877
Work continues on the bead boards for the interior walls.
Date: 12/14/2011
Views: 10875
|
IMG_4879
This is 18 inches of insulation in the depot ceilings.
Date: 12/14/2011
Views: 12746
|